Between 发表于 2025-3-23 12:39:57
http://reply.papertrans.cn/25/2422/242133/242133_11.png分开 发表于 2025-3-23 16:51:04
http://reply.papertrans.cn/25/2422/242133/242133_12.png无聊点好 发表于 2025-3-23 20:21:26
Michael Ndonye,Mellitus Wanyama continuous monitoring and recording response during earthquakes for condition assessment of the structure and possible damage detection. Strong motion instruments were installed on and near the bridge to record seismic shaking as well as response of the bridge to ground motions. This Paper describeRecessive 发表于 2025-3-24 01:50:14
http://reply.papertrans.cn/25/2422/242133/242133_14.pngAnticoagulants 发表于 2025-3-24 03:50:43
African Media Space and Globalizationnatures were used to build the model and predict using a deep learning approach. The prediction of the EMI signal was compared against experimental results, demonstrating the ability of the model to predict and forecast EMI signals with higher accuracy. The accuracy of the proposed model was validatManifest 发表于 2025-3-24 10:06:15
https://doi.org/10.1007/978-3-031-35060-3f the research, a two-storey shear frame structure joined with bolted connectors exposed to vibration and the dynamic properties of the structure would be obtained. Moreover, wavelet transform techniques (WTT) using continuous wavelet transform (CWT) and discrete wavelet transform (DWT) were used toGET 发表于 2025-3-24 11:27:43
Jonathan O. Chimakonam,L. Uchenna Ogbonnaya debonding and bonding cases it can be observed that there is a significant variation in the EMI signature of debonding instances concerning the perfect bond and the bond by considering the adhesive layer. Moreover, the increasing trend of RMSD values, indicates the debonding cases and the bond with厨师 发表于 2025-3-24 15:17:03
Monitoring and Structural Assessment of Instrumented Cable-Stayed Bridges Using Recorded Seismic Re was implemented to explain bearing behaviors under various earthquake levels. At the Shin-Nakagawa bridge (total length 533 m, main span 283 m), the development of wireless sensor network (WSN) and the results of 45-month continuous seismic monitoring campaign are described. The WSN monitoring syst漂浮 发表于 2025-3-24 21:10:18
Quantification of SHM Benefits and Costs Using the Theory of Value of Information,d in a broader context of asset management as an enabling technology. Then, the quantification of VoI of SHM data will be illustrated with applications to a prestressed concrete bridge, for which long-term strain monitoring campaigns enabled an accurate assessment of the net benefit of the financial神秘 发表于 2025-3-25 02:08:06
Bridge and Infrastructure Testing and Monitoring in MENA - Examplary Current State and Future Needsticle are some of the local lessons learned from contributions in the field infrastructure testing and monitoring in Egypt and the MENA region. The illustrated structures types include cable stayed roadway bridges, railway bridges, buildings and historical monuments. Furthermore the article will als