高尔夫 发表于 2025-3-28 15:58:47
Santanu Kumar Bal,Paramjit Singh Minhasased temporary structures monitoring system. We use model checking to try to detect the vulnerabilities in the system. The case study shows that model checking can identify vulnerabilities in a CPS-based system and help developers fix the vulnerabilities.Hippocampus 发表于 2025-3-28 21:58:13
,Model Checking – Case Study of a Temporary Structures Monitoring System,ased temporary structures monitoring system. We use model checking to try to detect the vulnerabilities in the system. The case study shows that model checking can identify vulnerabilities in a CPS-based system and help developers fix the vulnerabilities.Outwit 发表于 2025-3-29 02:10:27
http://reply.papertrans.cn/25/2419/241812/241812_43.pngbadinage 发表于 2025-3-29 05:17:21
http://reply.papertrans.cn/25/2419/241812/241812_44.pngpalpitate 发表于 2025-3-29 10:40:57
http://reply.papertrans.cn/25/2419/241812/241812_45.pngIncumbent 发表于 2025-3-29 13:20:45
Cyber-Physical Systems-Based Component Tracking and Operation,cal systems approach can be used to enhance the steel erection process, tracking and documentation of as-built of architectural and engineered components, tracking and control of bulk components during a facility lifecycle, and site layout management. A system architecture that illustrates the key tgout109 发表于 2025-3-29 16:26:06
Construction Progress Monitoring Using Cyber-Physical Systems,ecision making. In this chapter, we present how the latest robotics, computer vision technologies with construction management theories that can establish a CPS to enable performance tracking. We introduce the cutting edge techniques for each component in the CPS such as deep learning, object detect气候 发表于 2025-3-29 22:06:39
http://reply.papertrans.cn/25/2419/241812/241812_48.pngObligatory 发表于 2025-3-30 02:33:39
http://reply.papertrans.cn/25/2419/241812/241812_49.png尊重 发表于 2025-3-30 05:28:35
,CPS–Based System for Enhanced Mobile Crane Safety,erations is presented in this chapter. A system architecture was developed and the detailed workflow in building the system for CPS integration was discussed. The developed CPS was validated on a full-scale construction site to demonstrate its practical functionality. In the concluding part of this