角斗士 发表于 2025-3-28 15:05:33
Practice in the Construction of the Lime-Treated Soil Highway Subgrades in Jiaxing Cityhighway during service. The lime-treated soil particles are uniform, and a plate body structure can form after construction. (2) The water stability of the soil–stone slag mixture is low, water can easily permeate the subgrade, which induces an adverse impact. The water stability of the lime-treated贸易 发表于 2025-3-28 20:08:12
http://reply.papertrans.cn/24/2376/237522/237522_42.png阻止 发表于 2025-3-29 01:24:05
http://reply.papertrans.cn/24/2376/237522/237522_43.png有害处 发表于 2025-3-29 06:47:59
Practice in Treatment of the Bumps at Bridgeheads of the Highways in Ningbo Cityection is designed according to the standard for the first-class highway with 4–6 lanes; the design speed is 80 km/h; and the subgrade width is 26.5–45 m. The transportation of earthwork is restricted during highway excavation in urban areas. In addition, the outsourced fillers are also prohibited dCrayon 发表于 2025-3-29 08:02:00
https://doi.org/10.1007/978-3-663-05827-4the Qiantang River, canal dredging, drilling in overpass construction, can be utilized. A comparison between the soil–stone slag mixture subgrade and the lime-treated soil subgrade in Jiaxing City is provided in Table (9.1).无聊的人 发表于 2025-3-29 12:55:13
http://reply.papertrans.cn/24/2376/237522/237522_46.png胡言乱语 发表于 2025-3-29 19:18:04
Practice in the Construction of the Lime-Treated Soil Highway Subgrades in Jiaxing Citythe Qiantang River, canal dredging, drilling in overpass construction, can be utilized. A comparison between the soil–stone slag mixture subgrade and the lime-treated soil subgrade in Jiaxing City is provided in Table (9.1).debacle 发表于 2025-3-29 23:03:06
http://reply.papertrans.cn/24/2376/237522/237522_48.png小故事 发表于 2025-3-30 03:12:16
Rammsteins „Deutschland“978-3-662-64766-0Series ISSN 2730-7301 Series E-ISSN 2730-731X可商量 发表于 2025-3-30 06:13:19
http://reply.papertrans.cn/24/2376/237522/237522_50.png