善于 发表于 2025-3-25 04:52:48

https://doi.org/10.1007/978-3-662-33821-6 to a realistic scenario for the Maasvlakte situation in the near future. The experiments give insight into the importance of the different characteristics of the transport systems and their interaction with the handling equipment. Finally, a cost analysis has been executed to support management investment decisions.

彩色 发表于 2025-3-25 11:30:38

http://reply.papertrans.cn/24/2364/236301/236301_22.png

Corporeal 发表于 2025-3-25 12:14:33

http://reply.papertrans.cn/24/2364/236301/236301_23.png

移动 发表于 2025-3-25 15:57:54

http://reply.papertrans.cn/24/2364/236301/236301_24.png

Bother 发表于 2025-3-25 20:42:53

Simulation of a multiterminal system for container handlingof the new port area called “second Maasvlakte”. Experimental results including the requirements for deep-sea quay lengths, storage capacities, and equipment for interterminal transport are shown. Further traffic flows on the terminal infrastructure are determined, and the consequences of applying security scanning of containers are evaluated.

CORD 发表于 2025-3-26 03:14:28

http://reply.papertrans.cn/24/2364/236301/236301_26.png

委屈 发表于 2025-3-26 06:51:49

http://reply.papertrans.cn/24/2364/236301/236301_27.png

sterilization 发表于 2025-3-26 08:40:12

https://doi.org/10.1007/978-3-662-34447-7zation strategy then controls a construction heuristic which assigns vehicle movements to periods and vehicles to storage locations. It is aimed at efficient operations and at a balanced distribution of vehicle movements over the periods of the planning horizon.

overhaul 发表于 2025-3-26 14:20:01

Sitzung des Wissenschaftlichen Senatsat using the same concept for planning and revenue management is essential for consistency of planning and operation. To meet the real-time requirements of revenue management special computational strategies for solving the large models are necessary.

Flirtatious 发表于 2025-3-26 17:41:19

https://doi.org/10.1007/978-3-662-33821-6omplexity of this model two heuristics are also developed. The first is a sequential method while the second is a column generation method. A bound is developed that allows the quality of the solution to be judged. Lastly, a numerical investigation is provided and demonstrates that the algorithms perform adequately on most cases considered.
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Container Terminals and Cargo Systems; Design, Operations M Kap Hwan Kim,Hans-Otto Günther Book 2007 Springer-Verlag Berlin Heidelberg 2007