The Need for QA/QCQuality in construction is too important to be left to chance. Engineers must educate owners to insist upon a quality control plan, comprehensive inspection and a competent testing program.Cosmopolitan 发表于 2025-3-23 17:53:58
Codes and StandardsThe quality assurance plan of the owner may specify specific standards to be followed in his projects. Even if it does not, construction specifications often incorporate other standards that further define the quality requirements for the materials or methods to be used in the construction process.magnanimity 发表于 2025-3-23 20:56:09
http://reply.papertrans.cn/24/2361/236049/236049_13.png雄伟 发表于 2025-3-23 23:12:01
Legal AspectsQuality assurance during the preconstruction phase should be structured to meet very definite responsibilities of the owner and the architect-engineer. These include:大洪水 发表于 2025-3-24 05:52:58
http://reply.papertrans.cn/24/2361/236049/236049_15.png战胜 发表于 2025-3-24 10:36:01
Field AdministrationThe QC inspection team often has collateral duties in field administration, including the areas of mobilization, progress payments, and shop drawings.heirloom 发表于 2025-3-24 13:47:30
http://reply.papertrans.cn/24/2361/236049/236049_17.png性满足 发表于 2025-3-24 15:05:35
QC Field Testingnever) the design engineer (or architect) chooses. It is recommended that the quality assurance (QA) procedures call for an index of all test requirements (or the requirements themselves) to be listed in Division 1 of the specifications (01400 Quality Control). If this has not been done during the design phase, the QC group must set up an ..sleep-spindles 发表于 2025-3-24 20:40:22