Expostulate 发表于 2025-3-28 17:04:03
The Object of IMC: StakeholdersThe network-based bus scheduling problem consists of optimally linking trips to form work for individual buses operating in an urban area. A large number of short trips are considered and splited into groups so that all trips in the same group can be connected to form a feasible schedule for a bus, begining and ending at the same bus garage.hypnotic 发表于 2025-3-28 21:24:35
http://reply.papertrans.cn/24/2345/234458/234458_42.pnghumectant 发表于 2025-3-29 01:40:03
http://reply.papertrans.cn/24/2345/234458/234458_43.png敬礼 发表于 2025-3-29 06:43:04
https://doi.org/10.1007/978-3-642-04531-8Rodoviária Nacional (RN) is the largest mass road transport company in Portugal and one of the biggest in Europe. RN was founded in 1976 as a result of the nationalization of 93 different passengers and freight road transport companies.The main activity of RN consists in suburban and regional bus transport of passengers all over Portugal.infantile 发表于 2025-3-29 10:01:05
Maja Smrkolj LL.M. (Heidelberg)The Operation Planning System MICROBUS is designed as a desktop implementation for use in the operational planning departments of transport companies. It consists of the system modules microfahrplan (transport and vehicle scheduling) and microdienstplan (crew scheduling) .使闭塞 发表于 2025-3-29 11:49:23
Bettina Schöndorf-Haubold Dr. iur.The objectives of crew scheduling and crew rostering in public transport can be summarized as follows:aviator 发表于 2025-3-29 18:45:30
http://reply.papertrans.cn/24/2345/234458/234458_47.pngKidney-Failure 发表于 2025-3-29 23:19:49
http://reply.papertrans.cn/24/2345/234458/234458_48.pngHUSH 发表于 2025-3-30 00:02:16
A Lagrangian Relaxation Based Heuristic for the Urban Transit Crew Scheduling ProblemThe transit crew scheduling problem that we consider involves the determination of a set of work days for transit crews that cover all required vehicle movements at minimum cost. This problem is a fundamental one in the transit industry since labor costs predominate in nearly all large transit properties.失望昨天 发表于 2025-3-30 04:34:29
CREW-OPT: Crew Scheduling by Column Generation (Extended abstract)Three main types of algorithms to solve the urban transit crew scheduling problem have been I developed and used in practice: the Runcutting, the HASTUS and the Set Covering methods. In this J paper, we will restrict ourself to the solution of the Set Covering method using a column generation approach.