裂口 发表于 2025-3-30 08:19:25
Vehicle Routing with a Heterogeneous Fleet of Combustion and Battery-Powered Electric Vehicles Underosen when deploying homogeneous and heterogeneous vehicle fleets. To achieve that, vehicles with different capacities and ranges as well with combustion engines as with battery-powered electric engines are taken into consideration. Results show that when deploying homogeneous fleets there are no sig怎样才咆哮 发表于 2025-3-30 15:22:11
Time-Dependent Route Planning for Truck Driversobey government regulations that impose limits on non-stop driving times. Therefore, route planners must plan . in advance and select suitable parking lots. To ensure that maximum driving times are not exceeded, predictable congestion due to, e. g., peak hours should also be taken into account. Ther招募 发表于 2025-3-30 17:29:36
http://reply.papertrans.cn/24/2327/232647/232647_53.pngPalter 发表于 2025-3-31 00:47:23
http://reply.papertrans.cn/24/2327/232647/232647_54.pngApraxia 发表于 2025-3-31 03:14:27
Planning of an Offshore Well Plugging Campaign: A Vehicle Routing Approachuids. An increasing number of offshore wells needs to be P&A’d in the near future, and the costs of these operations are substantial. Research on planning methods in order to allocate vessels that are required to perform these operations in a cost-efficient manner is therefore essential. We use an o期满 发表于 2025-3-31 08:50:59
Arc Routing with Precedence Constraints: An Application to Snow Plowing Operations problem studied considers the clearing of snow from a network of roads, where there exists precedence relations between the driving lanes and the sidewalks. The goal is to minimize the total time it takes for a heterogeneous fleet of vehicles to clear all the snow from the road network. We describe不透明性 发表于 2025-3-31 12:05:19
Analysis of Partner Selection Problem in Horizontal Collaboration Among Shipperstifying compatible partners. To focus on the problem of coalition formation, we exploit a bi-objective mathematical model for a two echelon location routing problem (2E-LRP) to test if partners fit for the collaboration or not and if opportunity for each partner to make economic and environmental beEviction 发表于 2025-3-31 17:25:28
A Simple Mechanism for the Disaster Emergency Unit Scheduling Problemdfires, which is described as the worst in Chile’s modern history. We consider a DEU to control wildfires and . forestry companies. Each forestry company . is located in town .. We assume these companies do not satisfy all safety conditions in order to reduce the wildfires impact and then, an emerge