违反
发表于 2025-3-23 09:55:15
Earthworks and pipelines,ting fill. The larger sizes are powerful but are costly to run and maintain, so it is not economic for the contractor to keep one on site for the occasional job. Its principal full-time use is for cutting, or for spreading fill for earthworks in the specified layer thickness and compacting and bondi
happiness
发表于 2025-3-23 16:53:01
http://reply.papertrans.cn/23/2269/226881/226881_12.png
冷峻
发表于 2025-3-23 20:20:53
http://reply.papertrans.cn/23/2269/226881/226881_13.png
GROUP
发表于 2025-3-24 00:48:11
http://reply.papertrans.cn/23/2269/226881/226881_14.png
MOCK
发表于 2025-3-24 05:48:29
http://reply.papertrans.cn/23/2269/226881/226881_15.png
BUDGE
发表于 2025-3-24 06:51:37
http://reply.papertrans.cn/23/2269/226881/226881_16.png
drusen
发表于 2025-3-24 10:58:24
https://doi.org/10.1057/9780230598645to all the circumstances’ (Clause 2(8)). The parties to the contract can thus look to the engineer to carry out the administrative duties required under the contract fairly, and to make the decisions that are necessary to allow the works to proceed to completion. The parties reserve to themselves, h
Entrancing
发表于 2025-3-24 15:37:45
http://reply.papertrans.cn/23/2269/226881/226881_18.png
Decrepit
发表于 2025-3-24 21:18:45
Methodology of Buddhist Biomedical Ethicsonvenient method for surveying and levelling small or moderately sized sites is to use spot levelling on a 20 m grid, picking up any abrupt changes of level or gradient between these intervals. An instrument man and two chainmen are needed to carry out the work. Ranging poles, two fibreglass tapes,
空中
发表于 2025-3-25 03:03:10
http://reply.papertrans.cn/23/2269/226881/226881_20.png