高兴去去
发表于 2025-3-26 22:43:32
Case-Based Project Scheduling,revised to produce a complete and valid schedule by a modified version of the Serial Schedule Generation Scheme. We present experimental results showing that our approach works well under reasonable assumptions. Finally, we describe several ways to modify our algorithm in the future so as to obtain even better results.
TIGER
发表于 2025-3-27 05:07:19
http://reply.papertrans.cn/23/2224/222331/222331_32.png
figment
发表于 2025-3-27 06:45:31
http://reply.papertrans.cn/23/2224/222331/222331_33.png
脊椎动物
发表于 2025-3-27 12:10:59
Reconstructing ,(,) from a Plenary Subset of existing phantoms, the one to represent the subject. This paper introduces the EquiVox platform and Artificial Neural Networks developed to interpolate the subject’s 3D lung contours. The results obtained for the choice and construction of the contours are presented and discussed.
无意
发表于 2025-3-27 13:38:19
George W. Hanson,Alexander B. Yakovlev evaluation over three large case bases of problem instances from artificial, hand-crafted and industrial domains, shows the power of a CBR approach, and the importance of the adaptation schemes used.
expound
发表于 2025-3-27 19:20:34
http://reply.papertrans.cn/23/2224/222331/222331_36.png
Fierce
发表于 2025-3-27 22:46:54
http://reply.papertrans.cn/23/2224/222331/222331_37.png
GIST
发表于 2025-3-28 05:28:48
http://reply.papertrans.cn/23/2224/222331/222331_38.png
比目鱼
发表于 2025-3-28 06:20:37
http://reply.papertrans.cn/23/2224/222331/222331_39.png
繁忙
发表于 2025-3-28 11:17:39
http://reply.papertrans.cn/23/2224/222331/222331_40.png