扩大 发表于 2025-3-28 18:30:09
http://reply.papertrans.cn/23/2205/220468/220468_41.pngcunning 发表于 2025-3-28 22:25:01
Mohd Sayeed Akhtar,Mallappa Kumara Swamyineering problem solving. The assessment design is efficient for staff and students and allows a reduction in student stress levels while simultaneously giving them strong incentives to adopt good working practices. Evaluation evidence is given to demonstrate the efficacy of the approach.我的巨大 发表于 2025-3-28 23:09:39
Irfan A. Ansari,Mohd Sayeed Akhtaral compensation before introducing the PFC component. It is demonstrated that pre-stabilisation reduces the dependency of the closed-loop pole on the coincidence point and also improves robustness to uncertainty. Simulation results verify the improved performance as compared to conventional PFC.暂停,间歇 发表于 2025-3-29 05:13:36
employed too. This paper was developed on a simulated plant based on Clarke’s benchmark, which is controlled with a Dynamic Matrix Control. As a result, it can be seen that Dvurecenska’s metric accomplishes its objective and in some cases, gives better validation criteria than the other metrics analyzed.命令变成大炮 发表于 2025-3-29 08:32:25
even sometimes the saturated cascade control scheme gives worse results than a single control loop. Thus, this work analyzes this situation and introduces an alternative solution to solve this problem and to reduce the impact of the saturation effect.木讷 发表于 2025-3-29 14:11:04
http://reply.papertrans.cn/23/2205/220468/220468_46.png走调 发表于 2025-3-29 16:41:30
http://reply.papertrans.cn/23/2205/220468/220468_47.pngCLOUT 发表于 2025-3-29 20:37:34
http://reply.papertrans.cn/23/2205/220468/220468_48.png虚弱的神经 发表于 2025-3-30 00:56:22
http://reply.papertrans.cn/23/2205/220468/220468_49.png赦免 发表于 2025-3-30 04:25:05
http://reply.papertrans.cn/23/2205/220468/220468_50.png