mutineer
发表于 2025-3-25 04:12:59
Finite Element Method by Using Mathematicale funds. This leads automatically to regular inspections and the implementation of programmes of planned maintenance. These activities need to be backed up with adequate data and particularly a full awareness of maintenance and operating costs.
马具
发表于 2025-3-25 10:00:31
http://reply.papertrans.cn/20/1917/191692/191692_22.png
flaggy
发表于 2025-3-25 14:47:24
https://doi.org/10.1007/978-3-662-02977-0e with the drawings and specification. With the larger contracts it is customary to employ a clerk of works who is constantly in touch with the work, but with smaller schemes periodic supervision only can be obtained often through the medium of architects, surveyors, inspectors or other supervisory
circuit
发表于 2025-3-25 19:14:27
https://doi.org/10.1007/978-1-349-18925-0design; feedback; maintenance; surveying
Anticoagulants
发表于 2025-3-25 23:06:11
http://reply.papertrans.cn/20/1917/191692/191692_25.png
征服
发表于 2025-3-26 00:23:15
Specification of Maintenance Work, instructions to the contractor and prescribes the materials and workmanship requirements. When read in conjunction with the contract drawings, and bill of quantities where one is prepared, it provides all the information that a contractor will need to price the work and carry it out.
容易做
发表于 2025-3-26 05:55:20
http://reply.papertrans.cn/20/1917/191692/191692_27.png
农学
发表于 2025-3-26 09:32:43
http://reply.papertrans.cn/20/1917/191692/191692_28.png
corpus-callosum
发表于 2025-3-26 14:44:17
http://reply.papertrans.cn/20/1917/191692/191692_29.png
急性
发表于 2025-3-26 20:47:57
http://reply.papertrans.cn/20/1917/191692/191692_30.png