APNEA 发表于 2025-3-25 07:20:29

Regression Analysis as a Method of Telemetry Data Verificationcient of determinism R. is practically the same for different models for all objects. . The obtained approximating dependences, taking into account the flow rate, adequately and fairly accurately describe the physical process in the range of parameter changes recorded in the archive. When leaving th

grenade 发表于 2025-3-25 08:12:30

http://reply.papertrans.cn/20/1917/191688/191688_22.png

富饶 发表于 2025-3-25 12:03:57

http://reply.papertrans.cn/20/1917/191688/191688_23.png

高兴一回 发表于 2025-3-25 16:51:05

Conceptual Digital Organizational and Technological Model Scenarios at the Construction Organization optimize production processes, further maintainability and operational qualities. As a whole the scenario approach in information modelling forms the basis of the methodology for the transition to machine-readable forms of normative values and codes features for all types of resources for the imple

MELD 发表于 2025-3-25 21:07:10

Application Programming Interface Features of a Building Information Modeling at the Design Stage Wis been analyzed in terms of the task. It has been found that the presence of the API library does not guarantee a software can automate routine information modeling tasks. It is shown that one of the main reasons for this is the features of the API library classes structure development which does no

ASSAY 发表于 2025-3-26 00:55:28

http://reply.papertrans.cn/20/1917/191688/191688_26.png

magenta 发表于 2025-3-26 05:17:15

Critical Analysis and Forward Perspectives,uipment for water supply and disposal systems”. Application of the research results in water utilities’ operation will enable to improve the quality and reduce the working cost of provided services, will ensure the saving of infrastructure investments pumped into water and sewage facilities and faci

顽固 发表于 2025-3-26 08:59:27

https://doi.org/10.1007/978-3-031-37893-5and damages, systematize them, identify the causes of formation and develop standard recommendations for their elimination. The AIS developed with due account of all possible defects and damages of building structures of industrial buildings, according to the results of the inspection it enables to

并置 发表于 2025-3-26 15:00:45

https://doi.org/10.1007/978-3-319-20104-7omated using visual programming tools. A Dynamo script that automates the specific process of forming a directory structure is developed; the location and functionality of it are shown in business process diagrams. For ease of use, the created program uses a predefined structure in the MS Excel envi

缺陷 发表于 2025-3-26 17:24:59

Interfacial Heat and Mass Transfers,threats are considered. There were proposed the approaches to assessment of economic consequences of threat realization and the effectiveness of preventive protection measures. It was noted that capital facility should be considered in the format of the BIM-model describing all the stages of its lif
页: 1 2 [3] 4 5 6 7
查看完整版本: Titlebook: Building Life-cycle Management. Information Systems and Technologies; Selected Papers Alexander Ginzburg,Kashevarova Galina Conference proc