用不完 发表于 2025-3-28 15:14:27
Complexity Cost Managementreation of different variants of a product. The current understanding and state of awareness of the influence of complexity on cost structures is reflected in the results of a survey carried out by the authors. The methodology used to analyse the complexity costs of existing processes is described a–scent 发表于 2025-3-28 22:34:41
Key Principles of Flexible Production and Logistics Networkses in the supply network. This section of the book presents innovative flexible processes for inter-enterprise collaborative planning and execution. These processes support the industry’s need for effective and efficient collaboration of planning capacities throughout the supply network. These haveemulsify 发表于 2025-3-28 23:40:27
http://reply.papertrans.cn/20/1916/191549/191549_43.png纠缠 发表于 2025-3-29 05:24:08
http://reply.papertrans.cn/20/1916/191549/191549_44.png合群 发表于 2025-3-29 09:36:25
Functionalities of Supporting IT Systems: Current Situation, Future Requirements and Innovative Apprin 5 days. Unfortunately, the current IT infrastructure and systems applied within the automotive industry do not fulfil the requirements posed by new collaborative processes. The existing legacy systems were originally built for a “different world” of IT development, specific tasks (not integrated)adjacent 发表于 2025-3-29 11:54:47
Modelled Scenario Examples for Planning and Execution Processesdel uses demand data provided by industry and taken from a real car’s lifecycle, projected forwards to the years 2015 to 2022. All scenarios modelled are based on a specific product structure for a modular car. The product structure is broken down into defined modules such as the engine, the front,persistence 发表于 2025-3-29 17:32:18
A BTO Reference Model for High-Level Supply Chain Design production system. A build-to-order (BTO) approach can offer a solution to this challenge. Consequently, many innovative concepts have been developed, discussed and piloted in the context of process, structure and product redesign. Nevertheless, all players in an automotive supply network are contiprobate 发表于 2025-3-29 22:25:22
Overfull: The Immateriality of Walkingcost of providing flexibility in manufacturing on the other. In this chapter we discuss the impacts of BTO on the OEM as well as the component supply and distribution chain, and outline the key challenges that OEMs face on their way to implementing BTO, including approaches for mitigating these.我没有命令 发表于 2025-3-30 03:56:03
Glenn Parry,Andrew GravesAddresses the conceptual and practical aspects for achieving the rapid delivery to the customer of a bespoke vehicle only days after placing an order.Includes supplementary material:Feckless 发表于 2025-3-30 05:32:03
http://image.papertrans.cn/b/image/191549.jpg