擦试不掉 发表于 2025-3-25 04:30:45
Erreichbarkeit eines Praxisstandortes,s are discussed. The areas considered include microwave, acoustic and optical techniques, integrated sensor systems and motion measurements. Currently used bridge load monitoring procedures are also summarized.dowagers-hump 发表于 2025-3-25 07:45:14
http://reply.papertrans.cn/20/1908/190744/190744_22.pnganagen 发表于 2025-3-25 13:59:41
http://reply.papertrans.cn/20/1908/190744/190744_23.pngTHE 发表于 2025-3-25 19:44:54
http://reply.papertrans.cn/20/1908/190744/190744_24.png空气传播 发表于 2025-3-25 22:56:11
http://reply.papertrans.cn/20/1908/190744/190744_25.pngplacebo-effect 发表于 2025-3-26 01:47:33
Flaw Detection in Concrete Using the Impact-Echo Methodples of the results of analytical and experimental studies. A procedure called spectral peak plotting is described which simplifies interpretation of data from scans across a structure. By using this procedure a profile view of the interior of the test object can be constructed.完成 发表于 2025-3-26 04:43:02
A Dynamic Method for the Safety Inspection of Large Prestressed Bridgesjects are given. The latest investigations were started in Oct. 1988 on five bridges on Brenner motor-ways. The tests were finished in April 1989, analysis of measurements is still in process. More detailed results will be given in forthcoming papers.发酵 发表于 2025-3-26 10:43:15
http://reply.papertrans.cn/20/1908/190744/190744_28.pngBILK 发表于 2025-3-26 15:53:02
https://doi.org/10.1007/978-3-658-30983-1 than one centimeter for the localization and diameter evaluation of rebars. Performance evaluation of the prototype has been conducted on reinforced concrete slabs with practical configurations and on a bridge beam. The performance has been compared with that of magnetic metal detectors which are available on the market.踉跄 发表于 2025-3-26 17:44:20
http://reply.papertrans.cn/20/1908/190744/190744_30.png