Case Study VIII: Failure Due to Manufacturing DefectPower plant authority had experienced a failure of a water wall bend tube by the way of through-thickness longitudinal cracking at the extrados portion of the tube and referred the problem to probe into the metallurgical cause/causes of failure through systematic diagnostic approach.带来的感觉 发表于 2025-3-27 10:19:13
Case Study IX: Corrosion FatiguePower plant authority had experienced a failure of a economizer tube by the way of typical crack at two locations opposite to each other of the tube and referred the problem to probe into the metallurgical cause/causes of failure through systematic diagnostic approach.毛细血管 发表于 2025-3-27 17:38:22
http://reply.papertrans.cn/19/1896/189596/189596_35.png价值在贬值 发表于 2025-3-27 18:30:04
http://reply.papertrans.cn/19/1896/189596/189596_36.png挑剔小责 发表于 2025-3-27 22:27:55
http://reply.papertrans.cn/19/1896/189596/189596_37.pngonlooker 发表于 2025-3-28 03:21:54
https://doi.org/10.1007/978-981-99-3130-9Boiler Tubes; Overheating; Creep; Hydrogen Damage; High TemperaturePillory 发表于 2025-3-28 08:29:01