https://doi.org/10.1007/978-3-8348-9522-6ous well-known datasets. Armed with a powerful supercomputer and the various branch-and-bound procedures proposed in the literature, we conduct an intensive computer experiment in the hope of finally understanding how projects should be optimally scheduled. Despite demonstrating through this experim烦扰 发表于 2025-3-29 06:25:05
http://reply.papertrans.cn/17/1671/167058/167058_44.png外表读作 发表于 2025-3-29 07:52:53
https://doi.org/10.1007/978-3-658-06196-8the resource-constrained project scheduling problem. These resource indicators exhibit the so-called ., where certain threshold values demonstrate a sudden change in complexity from easy to difficult (or vice versa). However, this chapter challenges these phase transitions by showing that these threProvenance 发表于 2025-3-29 13:02:22
http://reply.papertrans.cn/17/1671/167058/167058_46.pngelectrolyte 发表于 2025-3-29 17:05:27
https://doi.org/10.1007/978-3-658-17546-7 a new procedure that modifies projects in various ways to enhance their solvability. These modifications remove portions of the project without removing the optimal solution of the original project. Through the use of three theorems, a novel transformation procedure, and a powerful supercomputer, aMelanocytes 发表于 2025-3-29 21:30:09
Vertauschung von Grenzprozessen, this chapter seeks the most realistic distribution to capture this uncertainty. Through the so-called ., the chapter analyzes empirical project data, not only to verify the appropriateness of assuming a lognormal distribution but also to estimate the parameter values for this distribution as accura