杀死 发表于 2025-3-30 12:07:22
http://reply.papertrans.cn/16/1593/159273/159273_51.pngexhibit 发表于 2025-3-30 16:28:00
Economically Designed Bayesian , Control Charts Using Dual Sample Sizes for Long-Run Processesimits under which the production process will be stopped for potential repair. For a static control chart, the design parameters are maintained at the same level from an inspection epoch to another. Several research papers showed that adopting dynamic control charts in which one or more of the desig