万神殿 发表于 2025-3-25 06:34:52
http://reply.papertrans.cn/16/1592/159116/159116_21.png全面 发表于 2025-3-25 10:14:34
An Approach for Wind-Pumped Storage Plant Scheduling Under Uncertaintyd to manage the risk during the scheduling of wind-PSP system by maximizing the total revenue, where the numbers of experiments are performed in order to access the criticality of possible outcomes. In this study, an adjustable speed type PSP unit is considered for better reliability.谎言 发表于 2025-3-25 11:44:10
Book 2018sed renewable energy resources. The irregularity in availability of resources and inefficiency in utilization of the available resources has reduced the potentiality of water and water based renewable energy resources. In recent years various soft computation methods (SCM) along with GIS were adopte表否定 发表于 2025-3-25 18:39:06
Review of Reservoir Sediment Inflow Estimation for Teriang Reservoir, Malaysiar useful service life, normally 100-year ARI design period. To achieve this objective, a review of the past and contemporary literatures and conventions on sedimentation issues in Malaysia as well as other regional countries is imperative. A case study was carried out using the proposed Teriang reseCountermand 发表于 2025-3-25 20:14:25
http://reply.papertrans.cn/16/1592/159116/159116_25.pngAntarctic 发表于 2025-3-26 01:05:14
http://reply.papertrans.cn/16/1592/159116/159116_26.png呼吸 发表于 2025-3-26 06:35:29
Development of Financial Liability Index for Hydropower Plant with MCDM and Neuro-genetic Modelss been increased simultaneously. As the resources of conventional fuels are limited, alternate energy sources to replace fossil fuels are now preferred to supply the excess demand. Among all the sources of alternate energy, hydropower was found to be the most reliable but inexpensive source of alter无法治愈 发表于 2025-3-26 12:12:04
http://reply.papertrans.cn/16/1592/159116/159116_28.pngFlatus 发表于 2025-3-26 14:06:04
A MCDM-NBO Approach for Selection of Installation Location for Wave Energy Power Plantsl shortcoming of converters, hostility from local populations and many other factors the cost of installation for wave power plant is expensive compared to other forms of renewable energy of the obstacles seems to be location dependent. That is why; selection of an ideal location for wave energy pro使尴尬 发表于 2025-3-26 18:30:57
Cost Optimization of High Head Run of River Small Hydropower Projectsaking a decision regarding development of a SHP project, its financial viability is to be assessed along with technical feasibility. In the present study, a methodology has been developed for cost assessment of high head run of river (ROR) SHP projects in order to determine their techno-economic via