学术讨论会
发表于 2025-3-25 03:33:52
http://reply.papertrans.cn/16/1585/158498/158498_21.png
engrossed
发表于 2025-3-25 09:28:39
http://reply.papertrans.cn/16/1585/158498/158498_22.png
黄油没有
发表于 2025-3-25 13:17:07
http://reply.papertrans.cn/16/1585/158498/158498_23.png
Kindle
发表于 2025-3-25 17:29:04
http://reply.papertrans.cn/16/1585/158498/158498_24.png
使无效
发表于 2025-3-25 21:08:25
Die Vorbereitung der Einkaufsverhandlung,y not a post-TMI-concept. However, the accident that occurred at Three Mile Island 2 in March 1979 demonstrated that a more structured system for experience feedback was needed to ensure a cumulative learning process from precursor incidents and transients.
厌倦吗你
发表于 2025-3-26 02:47:18
,Einkaufsverhandlungen (aus-)führen,support of licensing application and plant operation. Three kinds of model, two sets of input base deck for each, have been developed. Plant start-up transient recorder (STARTREC) data are used to benchmark RETRAN models for the transients and FSAR data for the accidents. Establishment of a well pre
entitle
发表于 2025-3-26 05:57:23
http://reply.papertrans.cn/16/1585/158498/158498_27.png
Liability
发表于 2025-3-26 09:59:24
https://doi.org/10.1007/978-3-322-89278-2room indication was lost. Safety Features actuated on low pressure following the reactor trip. When power was restored an hour and a quarter later, temperature had dropped to 285°F. The Reactor Coolant System was outside of its allowable pressure/temperature curve.
干涉
发表于 2025-3-26 16:36:20
The Risk from Transients According to Probabilistic Risk Assessment (PRA)have to do with the rate and magnitude of rapid pressure increases due to steam generation from the interaction of core debris with water. Some of the concern for these types of transients has subsided with a greater understanding of their contribution to risk. This is because without a simultaneous
保留
发表于 2025-3-26 17:09:56
Taipower Experience in Plant Transientsr. Four NOTEPAD activities relating to operation and maintenance data are selected for recatego-rization and supplemented by Taipower operating experience and USNRC IE Bulletins. The key words are used by four hierarchial levels for easy retrieval.