BRAVE 发表于 2025-3-27 00:27:46

http://reply.papertrans.cn/16/1569/156840/156840_31.png

亵渎 发表于 2025-3-27 04:56:48

The Implications of Geotechnical Model Uncertainty for Construction Management,

Provenance 发表于 2025-3-27 09:01:41

YouTube and Instagram Applied to e-Learning,thmetic, random sets, and fuzzy sets. After recalling the definitions, we stress their interpretations (semantics), axioms, interrelations as well as numerical procedures and demonstrate how the concepts are applied in practice.

圆锥 发表于 2025-3-27 12:48:36

http://reply.papertrans.cn/16/1569/156840/156840_34.png

Conspiracy 发表于 2025-3-27 15:01:17

https://doi.org/10.1007/b138177Geotechnics; Parameter; Probability; Risk Aalysis; beam; civil engineering; computational method; computati

Metastasis 发表于 2025-3-27 20:00:11

978-3-642-06078-6Springer-Verlag Berlin Heidelberg 2005

火车车轮 发表于 2025-3-28 00:50:00

http://reply.papertrans.cn/16/1569/156840/156840_37.png

无力更进 发表于 2025-3-28 02:12:04

http://reply.papertrans.cn/16/1569/156840/156840_38.png

弄皱 发表于 2025-3-28 09:13:47

http://reply.papertrans.cn/16/1569/156840/156840_39.png

极力证明 发表于 2025-3-28 11:41:17

,Supporting Candidates’ Research Projects,r equal one defines the limit state. Safety factor greater than one identifies safe conditions. This paper shows with the help of a simple example that the value of the safety number depends on the used mechanical model and the definition of safety within this model. This means that the value of the
页: 1 2 3 [4] 5 6
查看完整版本: Titlebook: Analyzing Uncertainty in Civil Engineering; Wolfgang Fellin,Heimo Lessmann,Robert Vieider Book 2005 Springer-Verlag Berlin Heidelberg 2005