sundowning 发表于 2025-3-25 03:32:08

http://reply.papertrans.cn/16/1563/156234/156234_21.png

conscribe 发表于 2025-3-25 07:42:08

Law, Governance and Technology Seriesting the supply chain lead time, or the order-to-delivery time is an important exercise. In this paper, we present stochastic network models for computing the average lead times of make-to-order supply chains. In particular, we illustrate the use of static probabilistic and generalized queueing networks for computing the lead times.

Adenocarcinoma 发表于 2025-3-25 11:51:37

Analysis of Two-Valve Fluid-Flow Systems with General Repair Times,. The Markov chain has both continuous and discrete states. We have constructed a system of linear equations for the boundary states and a set of differential equations for the interior states, that are solved using the eigenvalue method. We have also investigated the impact of down time variability on the system performance metrics.

串通 发表于 2025-3-25 17:37:10

Stochastic Lead Time Models for Supply Chain Networks,ting the supply chain lead time, or the order-to-delivery time is an important exercise. In this paper, we present stochastic network models for computing the average lead times of make-to-order supply chains. In particular, we illustrate the use of static probabilistic and generalized queueing networks for computing the lead times.

Esophagitis 发表于 2025-3-25 20:33:49

Process Adjustment for Assemblies,esses producing components for assembly. In the single process case, sufficient conditions are given for the optimal policy to have an upper and lower control limit form. In the two process case, we compare separate and combined policies and give an example where appreciable savings can be realized from a combined policy.

朋党派系 发表于 2025-3-26 03:40:57

Analysis of Automated Flow Line Systems with Repair Crew Interference,een the production and the repair system. The suggested model and solution approach are particularly helpful in the initial design phase as well as during a redesign process in order to evaluate alternative configurations of the planned production and repair system.

Meander 发表于 2025-3-26 06:38:53

http://reply.papertrans.cn/16/1563/156234/156234_27.png

抵消 发表于 2025-3-26 08:41:46

http://reply.papertrans.cn/16/1563/156234/156234_28.png

Salivary-Gland 发表于 2025-3-26 14:28:19

http://reply.papertrans.cn/16/1563/156234/156234_29.png

吞噬 发表于 2025-3-26 20:10:33

https://doi.org/10.1007/978-3-031-51067-0eady-state performance measures, like the probability of immediately satisfying a demand, the average number of backordered demands, the average number of finished products, etc. It can be applied for systems assembling any number of components and containing any number of stages in series after the assembly operation.
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Analysis and Modeling of Manufacturing Systems; Stanley B. Gershwin,Yves Dallery,J. MacGregor Smit Book 2003 Springer Science+Business Med