镇压 发表于 2025-3-23 13:09:00
https://doi.org/10.1007/978-3-540-93956-6rea completed from the same model assembly. On the contrary, the system is assembled with both architectural and structural model elements, thus, the measurement data from length and area values cannot be pulled out to table list by default scheduling features of modelling software. When the BIM mod含水层 发表于 2025-3-23 14:03:44
http://reply.papertrans.cn/15/1470/146960/146960_12.pngcharacteristic 发表于 2025-3-23 21:08:45
http://reply.papertrans.cn/15/1470/146960/146960_13.png假设 发表于 2025-3-24 01:06:01
https://doi.org/10.1007/978-3-319-78268-3eliveries. The aim is to provide a guideline through the development of an automated solution based on industry foundation classes (IFC) and a multi-agent system (MAS). The proposed approach comprises of three main phases, which are (1) development of sustainability assessment database and library,Irrigate 发表于 2025-3-24 04:06:58
Introduction to the Second Edition,of the proposed modeling approach is demonstrated in the case of selection of the most appropriate building project among a predefined set of projects. A project evaluation is done by using the given criteria and a group of experts. The final decision for the selection of the building project is a rpatriot 发表于 2025-3-24 08:36:07
https://doi.org/10.1007/978-94-007-0802-0es of challenges were identified for the integrated use of BIM and LCA in the AEC industry. The major contribution of this study is a comprehensive identification of the benefits and challenges of BIM-LCA integration. The results of this study may contribute to an increase in the utilization of the预知 发表于 2025-3-24 12:39:41
http://reply.papertrans.cn/15/1470/146960/146960_17.pngintegral 发表于 2025-3-24 15:23:36
http://reply.papertrans.cn/15/1470/146960/146960_18.png小步舞 发表于 2025-3-24 21:21:28
http://reply.papertrans.cn/15/1470/146960/146960_19.pngEeg332 发表于 2025-3-25 02:24:35
BIM-Based Automated Safety Review for Fall Prevention978-3-322-84547-4